Roofing project FAQ

Frequently asked questions in relation to the 2025 roofing project.

Updated 4/29/2025, (newest questions are added at the bottom)


After seven bids and countless hours of research and discussion, the board selected Cooper Mountain Roofing.  See March meeting minutes for more information.

  • They have been in business for 28 years,
  • They have an average star rating of 4.7 on Google/Yelp
  • They use high-quality shingles (Malarkey)
  • They are excellent communicators
  • They gave one of the most thorough and competitive bids
  • They are installing extra vents to extend the life of the shingles, reduce the chance of mold, and keep the homes cooler
  • They are within our budget

The project is scheduled to start May 13, weather permitting. Materials will start arriving on the property Friday, May 16. Some material will be placed on the roofs while other material will be placed in a shipping container. The shipping container is being delivered Thursday, May 15  AM and will be placed near center island closet to HilHi.

Monday - Friday from 7:30 a.m. to 6 p.m. and Saturdays from 8:30 a.m. to 6 p.m. If the weather is good and there is enough light, work may last until 8 PM.

Depending on the weather, the project will last 8 to 14 weeks.

A 10-year workmanship warranty. What this means is that if there any leaks or issues that were caused by the workmanship Cooper Mountain will fix the mistake free of charge for 10-years.

No, Cooper Mountain Roofing will take care of registering for the warranty.

Charcoal gray, similar to the color on the current roofs.

Asphalt shingles last between 20-30 years. We hope to get to the higher end of the range due to the workmanship of Cooper Mountain and the additional venting being installed. In addition, aggressive tree branch trimming and gutter repair will also aid in the extending the life of the shingles.

No. At this time, we anticipate the reserves to cover the overages, but we will not know the full scope of the work until the shingles are removed from the homes. As discussed in April’s meeting, we may have to do a special assessment if costs run high. If that happens, we do not anticipate the special assessment being more than $2-3000 per home which is significantly better than a $31,200, 20-year loan at 7 percent interest (PONO/Superior’s cheapest bid; see meeting minutes from April 2025.) In addition, as we discussed in May's meeting, watering of the property may have to be reduced.

Remove any patio furniture, plants, etc., from around your home. Remove any delicate/fragile items from the walls and shelves inside your home. Vibrations may run through the home as the old roof is removed and the new roof is put on. The HOA nor Cooper Mountain Roofing is responsible for items falling of the wall and/or shelves. Make sure to read the Robin Meadows Roofing Project letter.

Yes, it is unavoidable. Please care for pets and children appropriately.

The board will post a weekly update to RobinMeadows.com. To track the budget and spending, see the Roofing Project Cost Tracker.

A board member has emailed all homes with a satellite dish on its roof. Please fill out the questionnaire as soon as possible. If you have a satellite dish on your roof it will be removed. If you do not want the satellite to be reinstalled, it is the responsibility of the homeowner to dispose of the satellite dish. Please contact your satellite provider, as they may recycle it for you. Alternatively, you may be able to drop it off at Far West Recycling.

If you want to keep your satellite dish, please submit an ARC application. Following approval, please contact your service provider to reinstall the dish.

Warped, split, cracked, delaminated, rotted or structurally unsound sheathing that represents an unsuitable nailing surface is considered to be bad sheathing that will not hold roofing nails well, and could lead to shingles blowing off the house. Further, Cooper Mountain and the shingle manufacturer cannot provide a warranty for shingles installed on defective sheathing. Not all these defective plywood conditions are visible from inside the attic. Some of this damage is only visible on the top side of the plywood, which is only discovered when the existing roofing is torn off. Cooper Mountain will replace all structurally compromised or environmentally unsafe (mold) sheathing.

Yes, beginning Monday, 5/19/25, the gate to HilHi will be locked in order to protect the safety of the students. Once school is let out (June 12), the gate will be unlocked.

Roofing project update – 4/22/25

The weekly update on the 2025 roofing project.

PROJECT START DATE: Cooper Mountain Roofing anticipates starting roofing the week of May 13 (weather dependent). They expect the project to last 8-14 weeks.

Cooper Mountain will begin at the 3211/3212/3213 triplex during the week of May 13. A second crew will join the work the following week and will begin on triplex 3169/3171/3173.

CONSTRUCTION HOURS: Monday-Friday, 7:30 AM to 6 PM (up to 8 PM; weather/daylight dependent); Saturday 8:30 AM-6 PM (up to 8 PM; weather/daylight dependent)

MATERIAL DELIVERY: Material for the roofing project is scheduled for the week of April 28. The material will be stored in a shipping container in the middle of the island at the back of the property near Hilhi. Please advise kids not to play on the container.

DRIVEWAY ACCESS: Cooper Mountain will need access to your driveway for up to 3 days to safely and quickly dispose of the old roofing material.

HOME ACCESS: Homeowners will always have safe access to at least one entrance during construction.

HANDOUTS: Cooper Mountain Roofing provided handouts to homeowners who attended the Mar. 31 meeting. Those documents have been uploaded and can be accessed at the following links. We highly recommend reading them.


TREE TRIMMING: In preparation for the new roofs, to protect our gutters and fencing, and to mitigate the chances that pests can get into attics, tree trimming will occur throughout the entire neighborhood in the next several weeks.

Additional information about the roofing project can be found in the FAQ.