Roofing project is over 50% complete.
IMPORTANT INFORMATION:
Robin Meadows Roofing Project Letter | Roofing FAQ
Preparing for your new roof | Door notification
1. 3211/3213/3215 (DONE, 5/27),
2. 3169/3171/3173 (DONE, 6/6), 3151/3153/3157 (DONE, 6/14)
3. 3179 (DONE, 6/14), 3181 (DONE, 6/13), 3187 (DONE, 6/12), 3189 (DONE, 6/8), and 3201 (DONE, 6/13)
4. 3203 (DONE, 6/12), 3205 (DONE, 6/12)
5. 3125, 3127, 3129 (MATERIAL DELIVERED, 6/16) , 3027, 3130, 3132 (DONE, 6/18)
6. 3071, 3073 (DONE, 6/23), 3077/3079/3081, 3085, 3087 (MATERIAL DELIVERED, 6/24)
7. 3170/3168 (MATERIAL DELIVERED, 6/24), 3162 (DONE, 7/1), 3160 (DONE, 6/30), 3167 (DONE, 6/25), 3165 (MATERIAL DELIVERED, 6/24)
8. 3084, 3082, 3078, 3076, 3074
9. 3206/3204/3202, 3214/3212/3210

Monthly board meeting scheduled for Monday, July 7 at 7 PM.
The Robin Meadows monthly board meeting will occur on Monday, July 7 at 7:00 PM at 3130 SE Blue Bird Drive.
August’s board meeting is tentatively scheduled for Monday, August 11.
Agenda:
Spring/early summer tree trimming project is complete.
The tree trimming project is complete. A big thanks to Dan N., Kathy N., Randy M., Shawnna A., Torrance N., and Victor R. for their time and work. This extensive project took over two months and was completed to protect the life of the new roofs. This project was completed at a significant savings—easily over $15,000 in labor costs—while helping reduce the risk of future property damage. Our goal is to make tree maintenance manageable, sustainable, and cost-effective over the long term.
It’s important to note that our original roofs lasted over 20 years, largely because the trees were younger and smaller at the time. Today, many of our trees are mature and significantly larger, which means roof care requires ongoing attention. If we want our new roofs to enjoy a similar lifespan, we must remain vigilant.
Roofing professionals consistently highlight two key practices for extending the life of a roof:
These actions help prevent moss growth—a common cause of roof deterioration and leaks. By staying proactive with tree maintenance, we’re investing in the long-term durability of our homes.
In 2026, the board hopes to have enough funds to hire a tree company to trim back the large branches hanging over roofs around the neighborhood.
As a reminder, trees located in backyards are the responsibility of individual homeowners to maintain. To help protect your roof, siding, gutters, and fencing, the recommended clearance is 3 to 8 feet between tree branches and your home’s structure. The HOA is not responsible for any exterior damage caused by untrimmed trees in a homeowner’s backyard. A homeowner’s backyard is not a common area and therefore not the responsibility of the HOA.
If you’re unsure how to proceed or need assistance, we encourage you to connect with neighbors or contact the board.
Roofing project is nearing 50% completion.
IMPORTANT INFORMATION:
Robin Meadows Roofing Project Letter | Roofing FAQ
Preparing for your new roof | Door notification
1. 3211/3213/3215 (DONE, 5/27),
2. 3169/3171/3173 (DONE, 6/6), 3151/3153/3157 (DONE, 6/14)
3. 3179 (DONE, 6/14), 3181 (DONE, 6/13), 3187 (DONE, 6/12), 3189 (DONE, 6/8), and 3201 (DONE, 6/13)
4. 3203 (DONE, 6/12), 3205 (DONE, 6/12)
5. 3125, 3127, 3129 (MATERIAL DELIVERED, 6/16) , 3027, 3130, 3132 (DONE, 6/18)
6. 3071, 3073, 3077/3079/3081, 3085, 3087 (CURRENTLY BEING WORKED ON, 6/19)
7. 3170/3168, 3162, 3160, 3167, 3165 (MATERIAL DELIVERED, 6/24)
8. 3084, 3082, 3078, 3076, 3074
9. 3206/3204/3202, 3214/3212/3210

35% of the roofing project is complete.
IMPORTANT INFORMATION:
Robin Meadows Roofing Project Letter | Roofing FAQ
Preparing for your new roof | Door hanger notification
1. 3211/3213/3215 (DONE, 5/27),
2. 3169/3171/3173 (DONE, 6/6), 3151/3153/3157 (DONE, 6/16)
3. 3179 (DONE, 6/14), 3181 (DONE, 6/13), 3187 (DONE, 6/12), 3189 (DONE, 6/8), and 3201 (DONE, 6/13)
4. 3203 (DONE, 6/12), 3205 (DONE, 6/12)
5. 3125, 3127, 3129, 3027, 3130, 3132 (WORK STARTED, 6/16)
6. 3071, 3073, 3077/3079/3081, 3085, 3087
7. 3170/3168, 3162, 3150, 3167, 3165
8. 3084, 3082, 3078, 3076, 3074
9. 3206/3204/3202, 3214/3212/3210

Two triplexes and one single family home have been completed.
IMPORTANT INFORMATION:
Robin Meadows Roofing Project Letter | Roofing FAQ
Preparing for your new roof | Door hanger notification
1. 3211/3213/3215 (DONE, 5/27),
2. 3169/3171/3173 (DONE, 6/6), 3151/3153/3157 (MATERIAL DELIVERED, 6/3; started 6/11)
3. 3179, 3181, 3187, 3189 (DONE, 6/8), and 3201 (MATERIAL DELIVERED, 5/28)
4. 3203, 3205 (MATERIAL DELIVERED,5/28)
5. 3125, 3127, 3129, 3027, 3130, 3132 (MATERIAL DELIVERED, 6/10)
6. 3071, 3073, 3077/3079/3081, 3085, 3087
7. 3170/3168, 3162, 3150, 3167, 3165
8. 3084, 3082, 3078, 3076, 3074
9. 3206/3204/3202, 3214/3212/3210